Preventive Maintenance Work Plan Chart Page 35

ADVERTISEMENT

Preventive Maintenance Work Plan
Frequency Key
W – Weekly
M - Monthly Q - Quarterly
SA- Semi-Annually A- Annually SST - Seasonal Start-Up SSH - Season Shut Down
Emergency Diesel Generator
Critical Tasks
Frequency Status
Date Completed Initials
Check with the operating or area personnel for any obvious deficiencies.
M
Check turbine oil level; add oil as required.
M
Change turbine oil and oil filter; check transmission oil level.
M
Check that the crankcase heater is operating properly.
M
Replace turbine air filter.
M
Check wiring, connections, switches, etc; adjust as required.
M
Check starter for proper operation; lubricate as necessary.
M
Check fuel nozzles, fuel regulator and ignition device condition; service or replace as required
M
Perform 30 minute generator test run; check for proper operation.
M
Check and record transmission oil pressure and temperature, and natural gas pressure
M
Record running time
M
Check that the charger is operating properly
M
Check for any signs of corrosion on battery terminals or wires
M
Check the electrolyte level in the batteries; add if required.
M
Check the specific gravity of the electrolyte in a 10% sample of the batteries
A
Check 25% of terminal to-cell connection resistance; rehabilitate connections as required; add
A
anti-corrosion grease to battery terminals and connections.
Measure and record individual cell and string float voltages
A
Clean area around generator.
M
Fill out maintenance checklist and report deficiencies.
M

ADVERTISEMENT

00 votes

Related Articles

Related forms

Related Categories

Parent category: Business