Cod Test Cases Page 40

ADVERTISEMENT

COD Test Cases
Wrap-Up
This section describes the final steps associated with the testing process
and provides some suggestions for the school during the conversion to a
production status.
Notification of Results
The COD School Relations Center notifies the contact person at the
participating school of the results of each test cycle. If problems are
discovered, a retest is scheduled. The contact person should be available
during the testing period to analyze problems, assist with, and coordinate
any follow-up tests that may be required. Schools should contact the
COD School Relations Center if test results are not received or
communicated when expected.
Preparing School Database for Production
The school should clean out their system, by removing all test data,
Production data is processed using
before sending production data.
the production message classes
Volume II, Section 2
outlined in
of
Warning: Ensure that the system date is changed back to the current
this technical reference.
date and that message classes and destinations have been changed
from ‘test’ to ‘production’.
Warning: All test data MUST be removed from a school’s system
prior to beginning actual processing and before sending live
production data to COD.
Warning: Test Message Classes and the Test Destination Mailbox
MAY NOT be used to process production data.
Page V - 2 - 40
2012-2013 COD Technical Reference
June 2012
Volume V – School Testing Guide

ADVERTISEMENT

00 votes

Related Articles

Related forms

Related Categories

Parent category: Education