Standard Form 30 - Amendment Of Solicitation/modification Of Contract Page 24

ADVERTISEMENT

CONTRACT NO.
DELIVERY ORDER NO.
AMENDMENT/MODIFICATION NO.
PAGE
FINAL
N00178-04-D-4147
HR18
03
22 of 38
SECTION E INSPECTION AND ACCEPTANCE
All terms and conditions, including clauses, in the MAC basic contract are hereby expressly incorporated into this
task order award.
HQ E-1-0001 INSPECTION AND ACCEPTANCE LANGUAGE FOR DATA
Inspection and acceptance of all data shall be as specified on the attached Contract Data Requirements List(s), DD
Form 1423.
HQ E-1-0007 INSPECTION AND ACCEPTANCE LANGUAGE FOR LOE SERVICES
For all 7000 and 9000 series CLIN(s)/SLIN(s) - Inspection and acceptance shall be made by the Contracting
Officer’s Representative (COR) or a designated representative of the Government.
HQ E-2-0004 COST OF QUALITY DATA (NAVSEA) (MAY 1995)
Cost of Quality Data: The contractor shall maintain and use quality cost data as a management element of the
quality program. The specific quality cost data to be maintained and used will be determined by the contractor.
These data shall, on request, be identified and made available for "on site" review by the Government representative.
HQ E-2-0008 INSPECTION AND TEST RECORDS (NAVSEA) (MAY 1995)
Inspection and Test Records: Inspection and test records shall, as a minimum, indicate the nature of the
observations, number of observations made, and the number and type of deficiencies found. Data included in
inspection and test records shall be complete and accurate, and shall be used for trend analysis and to assess
corrective action and effectiveness.
HQ E-2-0015 QUALITY MANAGEMENT SYSTEM REQUIREMENTS (NAVSEA) (SEP 2009)
The Contractor shall provide and maintain a quality management system that, as a minimum, adheres to the
requirements of ANSI/ISO/ASQ 9001-2008 Quality Management Systems and supplemental requirements imposed
by this contract. The quality management system procedures, planning, and all other documentation and data that
comprise the quality management system shall be made available to the Government for review. Existing quality
documents that meet the requirements of this contract may continue to be used. The Government may perform any
necessary inspections, verifications, and evaluations to ascertain conformance to requirements and the adequacy of the
implementing procedures. The Contractor shall require of subcontractors a quality management system achieving
control of the quality of the services and/or supplies provided. The Government reserves the right to disapprove the
quality management system or portions thereof when it fails to meet the contractual requirements.
Contractor Performance Assessment Reporting System (CPARS)
Contractor performance under this task order will be evaluated annually utilizing the Contractor Performance
Assessment Reporting System (CPARS). The Contractor may obtain more information regarding the CPARS
process at: https://

ADVERTISEMENT

00 votes

Related Articles

Related forms

Related Categories

Parent category: Legal