Standard Form 30 - Amendment Of Solicitation/modification Of Contract Page 29

ADVERTISEMENT

CONTRACT NO.
DELIVERY ORDER NO.
AMENDMENT/MODIFICATION NO.
PAGE
FINAL
N00178-04-D-4147
HR18
03
27 of 38
(b) Contractors submitting payment requests and receiving reports to WAWF using either Electronic Data
Interchange (EDI) or Secure File Transfer Protocol (SFTP) shall separately send an email notification to the COR
and CO on the same date they submit the invoice in WAWF. No payments shall be due if the contractor does not
provide the COR and CO email notification as required herein.
HQ G-2-0002
CONTRACT ADMINISTRATION DATA
Enter below the address (street and number, city, county, state and zip code) of the Contractor's facility which will
administer the contract if such address is different from the address shown on the SF 26 or SF 33, as applicable.
The Contractor points of contact for this Task Order are as follows:
SECTION G NOTES:
1) ACCOUNTING DATA
The award document will include Accounting Data at the end of Section G. All lines of accounting are listed
sequentially under a heading that identifies the particular action (award or modification number) under which the
funding was obligated. Under SeaPort, all funding is identified/obligated at the Sub-contract Line Item Number
(SLIN) level. SLINs are established sequentially by the SeaPort software. Each obligation of funds receives a unique
SLIN identifier, unless the obligation is an increase to an existing Accounting Classification Reference Number
(ACRN), in which case the existing SLIN and ACRN will be increased. Accounting for expenditures and invoicing
at the SLIN level is required.
2) SPECIAL INSTRUCTIONS
Each SLIN providing funding designates a specific project area/work area/Technical Instruction (TI)/Work
Breakdown Structure (WBS) item. Tracking and reporting shall be accomplished at the project/work area/TI/WBS
item level. Each identified project/work area/TI/WBS shall be invoiced by its associated SLIN and ACRN as
identified on the TI.
3) TASK ORDER RATES
The following rates have been approved for this TO.
Annual Labor Escalation: 1.99% per year
Maximum Pass-Thru Rate: 3.43% Fixed Fee on Subcontractor Costs, Total Pass-Thru amount not to exceed 8%.
Maximum Fee: 6.95% on Prime Costs

ADVERTISEMENT

00 votes

Related Articles

Related forms

Related Categories

Parent category: Legal