Multi-Year Analysis Plan Page 31

ADVERTISEMENT

6.2.2
National
1/2004 Complete MYAP.
Reduces pioneer plant
Laboratory
6/2004 4 to 5 biorefinery designs –
risk
Crosscutting
stage 1 analysis.
Provides Biorefinery
Analysis
1/2005 Biorefinery design and costing.
proof of concept
(NREL)
6/2005 Complete analysis of the role of
Addresses process
biomass in America’s Energy
integration challenges
Future (RBAEF).
Ensures feasible
7/2005 Emerging technologies update.
advanced technologies
9/2005 Plan for strategic analysis that
enter the R&D
defines the vision and path to get
program
there.
6/2006 Comprehensive emerging
Biorefinery analysis.
9/2007 Advanced technologies status
report.
5/2008 Comprehensive advanced
Biorefinery analysis.
27

ADVERTISEMENT

00 votes

Related Articles

Related forms

Related Categories

Parent category: Education